The St-Etienne’s WTP treats the town’s wastewaters before discharging into the Tauge, an Aveyron’s affluent.
The plant’s presentation with some figures
Nominal capacity : 1900/2300 PE (a plant of 1900 PE extensible to 2300PE afterwards)
Opened in 2008
Contracting authority : Communauté de Communes des Terrasses et Vallée de l’Aveyron – CCTVA
Project engineer : Ginger Environnement Infrastructures – GEI
Constructor : Epur Nature
Associated firms : Génie civil Causse & Brunet, granulats RUP, pompes ABS
Receiving water : La Tauge stream, affluent of the Aveyron river
Rejection norm : BOD < 25 mg/l ; CDO < 125 mg/l ; SS < 35 mg/l
Winter serie: VFCW1 (vertical flow constructed wetlands)+ VFCW2
Summer serie: VFCW1+ primary ponds+ VFCW2
Dimensions: 1.2 m²/PE (filtre 1) + 2.2 m²/PE (ponds - 5100 m²/2300PE) + 0.8 m²/PE (filtre 2)
Particularities:
The integration of the primary ponds in the treatment steps (only during summer) improves the rejected water quality during the low water period therefore the most sensitive period for the receiving water.
Regular follow-up by the SATESE because the serie is new. The 24hours campaign done in the summer 2009 shows that the primary ponds’ insertion in the treatment steps improves the efficiency on phosphorus and especially on nitrogen contents.
Only the treatment plant (except exterior network), from 1 to 1900 PE.
Implementation cost: 740 000 €HT or 389 €/PE
Planned running cost: 1900 PE x 10 €/PE = 19 000€/year
Real running cost (except extraction of sludges and renewal costs): 16000€/year
2010 | |||
---|---|---|---|
Total | % | €/PE | |
Average cost | 1200 EH | ||
Usual maintenance | 272 h x 20€/h = 5440 € | 22 | 1.8 |
Filters maintenance | 140 h x 20€/h = 2800 € | 34 | 1.5 |
Green’s maintenance | 220 h x 20€/h = 4400 € | 28 | 2.3 |
Hydro cleaner | 5 U x 142 = 710 € | 3 | 0.4 |
Electricity | 16 800 kWh x 0.08 = 1344 € | 11 | 0.7 |
Drinking water | 1155 m³ x 1.2 €/m³ = 1386 € | 2 | 0.7 |
Total | 16 070 € | 100 | 8.4 |
Organisms | Studies and others | Works | General total | % |
---|---|---|---|---|
State | 25 000 € | 170 000 € | 195 000 € | 23 % |
Water Agency | 30 000 € | 207 000 € | 237 000 € | 28 % |
Department council | 50 000 € | 340 000 € | 390 000 € | 46 % |
CCTVA | 5 000 € | 23 000 € | 28 000 € | 3 % |
Total | 110 000 € | 740 000 € | 850 000 € | 100 % |